stop oil

GOD BLESS USA
GOD BLESS USA
GOD BLESS USA


The most practical method of absolute stop leakage of oil from wells.

If we do not stop the leakage of oil, then after two months (until August, BP will not open the second well), will translate into the sea every day, 50000 - 60000 barrels of oil.
55000 barrels x 60 days = 3.3 million barrels. This is 13 more accidents tanker Exxon Valdez!
DEVIL 13!

British Petroleum in May 2010 under the high pumped into the special solution, which is the density of 2 times heavier than water. Everything would have been nice if the cement in a solution had to be hard.

When the solution is pumped, drain oil from the well was not, the solution with its weight and high pressure kept the oil.

But when the feed solution ended, he was again flowing out from the wells.

It is clear that the pressure of the solution was less than the pressure of oil and gas, but also SOLUTION IN A WELL Before harden.

HIGHLIGHTS - a solution was not support to remain in the pipe.

To keep the solution in the tube need a powerful force base.
This is a heavy reliance power dome, the inner surface of which is to be completed the same solution with cement.

Then again pushed out from the tube wells solution, stop in a sealed dome.

Option 1.
In the tube wells is pumped into a special heavy solution.
From the well separated pipe, through which the solution was fed into the tube wells.
Above the tube wells installed a heavy large dome, such as the dome № 1 BP.
The dome has a hole and the valve, which should close automatically.

The pressure in the borehole will raise up the solution (as it was in May). Part of the solution displace water from the dome will fill it.

This solution is in the dome should quickly harden. You can do this by adding a solution of special substances.
In the dome is container (s), they are substances that make the solution hard. Containers have a valve, a device to open it and spray these substances.

(The same containers can be filed in the well together with the solution, where they will be opened and the solution begins to harden in the tube wells.)

Next, the valve closes, and the solution will remain in the dome in the solid state.
The mass of the dome - 100 tons, a solid solution inside the dome - 500 - 1000 - 2000 tons - it will keep oil prices. Also the solution in the well enough time to harden.

Option 2.
Option 1 is the dome is installed after the pipe is pumped into the solution, it is best to first install the dome, and then pumped into the solution.

Option 3.
The dome is installed on the well after the injection into her solution.
The dome has 2 openings with valves, opening-closing.
After installation of the dome in a high pressure through the pipe through the hole 1 is cement. The solution displaces the dome of the water and fills the dome.
Closes the valve 1 and 2.
Cement in the dome pfndthltdftn /

Option 4.
All, as in versions 1-3. But at the end of the injection into the well of the solution with solution pumped into the well small containers of solid rubber. Each container is inside the cylinder with compressed gas, eg air.
Once completed the process of injection solution into the well automatically open cylinder valves.
Containers will inflate with air pressure, and they additionally closed tube.

Option 5.
Just as in versions 1-3. But with injections into the well of the solution together with him in the well is pumped swell packers. They swell in contact with the oil-water drilling fluid.

Swell packers may be in a light tight containers.
Once completed the process of injection solution and containers with swell packers in the hole, automatically opens valves containers. Swell packers begin to swell in the borehole.

Swell packers and the solution can be filled in later and the dome.
-------------------------------------------
If today (it had to do yesterday) does not close the hole by 100%, it does not help, and new wells in August 2010, because until August will result so much oil that it is impossible to collect,

So today should not be used for pumping from a well a small portion of oil, and it is absolutely closed.

P.S. 1. If the company does not override the BP pipeline in July 2010, then in August - September 2010 in the Gulf of Mexico would not be easy ENVIRONMENTAL CATASTROPHE +

THERE WILL =

E C O L O G & H E C K J H E R N O N A L B.

P.S. 2. In addition, the approaching season of tropical storms, which will last until December 2010. For weather forecasts of hurricanes will be in the region to 23, of which 14 are possible storm.
A storm - is to stop the pumping of oil from damaged wells and delays in drilling well number number 2, 3.

Delays in the works - more millions of barrels of oil will spill into the sea.

To not allow ENVIRONMENTAL CHERNOBYL MUST STOP OIL AT 100% in July 2010.



Yours faithfully, Eugene Kulikov E-Mail: kuli-kov@yandex.ru

http://narod.yandex.ru/guestbook/?owner=258872301